03.05.2024
After a long time of preparation and arrangments 7WL loaded another pair of crane girders at their customer. With a planning timeframe of over 6 months the two cranes with a weight of around 50 tons and a length of about 30 meter each has been moved from factory in Eastern Germany. Within 3 nights of transit the crane arrives safely at their new facility in the center of Germany.
Another example that 7WL is a real expert in the field of crane transport.