18.10.2021 After a period of more or less 8 month, 7WL finished their project in Aalen. Within this time, 7WL loaded around 500 container and oversize items and shipped the same to Bangladesh. Also during these crazy times with high rates, less avaibility of equipment and full vessels, 7WL was able to make his customer […]