Author: Redaktor

7 Worldwide Logistics

7WL moves heating equipment to Egypt

24.02.2023 7WL can report another successfully completed project. On behalf of our partner from Egypt, we took over 3 boilers as well as various containers with accessories from a well-known manufacturer in the seaport of Hamburg and shipped them to Alexandria, Egypt. The boilers had a weight of approx. 55 tons, dimensions of nearly 10 […]

Bitumen Tanks ex Germany to France

15.02.2023 7WL just recently finished another inland OOG transport job for one of their customers. After a preparation time of a few weeks 7WL managed the loading of the 3 bitumen tanks from loading point close to Hanover without any problems and successfully arranged the planned delivery after 2 transport nights to  the unloading place […]

Crane Girders ex Germany to Arizona, USA

06.01.2023 7WL is happy to share some news about a recently finished project ex Germany to USA. On behalf of their customer – a well known supplier for hoisting equipment – we arranged the transport of several crane girders with length up to 28 meter and accessories packed in boxes with a maximum width of […]

80 tons Crusher Unit from West to East

18.08.2022 We are happy to report about another transport executed by 7WLs Project Department. Just recently we loaded another Crusher Unit (1935 x 300 x 408 cms // 78,3 tons) from Moerdijk, NL to construction site close to Gdynia. Transport was performed by 4 Axle Mercedes Truck in combination with 7 Axle Trailer and will […]

FOB Hamburg for India by fleet of barges

14.07.2022 7WL just recently a bigger FOB shipment on behalf of a well known world leading producer of pressure vessel, heat exchangers and compressors. The total volume consisted of 48 Secondary Line Exchanger (Top and Bottom) , 4  USX Units, several Lifting Devices and spare parts in cases. Alltogether we faced a transport volume of […]

Challenging 69 tons Trafo Transport to Greece

28.06.2022 7WL Bremen just recently finished the transport of a 69 tons Trafo from Eltmann, Germany to Piraeus Port Greece incl. arranging the mobile crane for lifting ex storage place onto truck. The timeline of this transport was under special pressure as the trafo was urgently needed in Greece for support of existing equipment during […]